My WebLink
|
Help
|
About
|
Sign Out
2277 (PART 2)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2277 (PART 2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2008 8:40:39 AM
Creation date
7/30/2007 10:47:14 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/9/1983
DOCUMENT NO
2277
DOCUMENT NAME
PUD-82-10
NOTES
MUTUAL LAND COMPANY
NOTES 2
DEVELOPMENT PLAN FOR 28 PARCELS FOR 1 FAMILY RESIDENTIAL USE
NOTES 3
E. OF TERMINUS OF CRELLIN RD.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
24. That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />25. That approval of the storm drainage system be withheld <br />pending final design and until the developer has demonstrated <br />to the satisfaction of the City Engineer that the system is <br />adequate, connects to an approved point of discharge, meets <br />any and all applicable requirements of the Alameda County <br />Flood Control District - Zone 7, meets any and all applicable <br />requirements of the Federal Emergency Management Flood Hazard <br />Program, and meets the immediate and long-range requirements <br />of this development and all upstream areas intended to be <br />drained through this tract. <br />26. That electric power distribution, gas distribution, <br />communication service, and any required alarm systems <br />be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City <br />Engineer. <br />27. That the developer be responsible for the installa- <br />tion of the street lighting system within the <br />development. The street lights shall be 70 watt, <br />high pressure sodium vapor units mounted on gal- <br />vanized steel poles with poured in place bases, <br />on the LS-1C schedule per City requirements and <br />P,G.andE. standard details unless otherwise <br />specifically approved. Approval for the number, <br />location, and type of electroliers shall be <br />withheld pending final design and review by the <br />City Engineer. <br />28. That in-lieu park dedication fees be collected by <br />the City prior to approval of the final map at the <br />rate then in effect and for the total number of <br />lots in the final map, unless this requirement <br />has been otherwise satisfied. <br />29. That any existing assessment district, which the <br />property may be subject to, be cleared prior to <br />the approval of the final map or the developer <br />will cause a segregation to be completed in <br />conjunction with the final map. <br />30. That all applicable conditions of PUD-80-3 <br />be met. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.