My WebLink
|
Help
|
About
|
Sign Out
2277 (PART 2)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2277 (PART 2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2008 8:40:39 AM
Creation date
7/30/2007 10:47:14 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/9/1983
DOCUMENT NO
2277
DOCUMENT NAME
PUD-82-10
NOTES
MUTUAL LAND COMPANY
NOTES 2
DEVELOPMENT PLAN FOR 28 PARCELS FOR 1 FAMILY RESIDENTIAL USE
NOTES 3
E. OF TERMINUS OF CRELLIN RD.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15. That all lots shall drain surface runoff to the streets <br />fronting them. <br />16. That all lots shall be provided with through curb <br />drains, <br />17. That the off-site storm drain systems be provided <br />with all-weather access for service and emergency <br />vehicles. <br />18. That approval of the water supply and distri- <br />bution system be withheld pending final design <br />and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed <br />system meets both the immediate and long-range <br />requirements for supplying water in this area. <br />19. That the developer comply with any and all <br />applicable requirements of the cross-connections <br />control and backflow prevention device programs <br />required by the California Administrative Code, <br />Title 17. <br />20. That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />"- Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit. <br />21. That a separate water meter be provided to each <br />lot of record within the development unless <br />otherwise approved by the City Engineer. <br />22. That approval for the number, type and location <br />of fire hydrants be withheld pending final design, <br />review by the Fire Marshal, and final review by <br />the City Engineer. <br />23. That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate, <br />connects to an approved point of discharge, and <br />meets both the immediate and long-range require- <br />ments of the sanitary sewer system in this and all <br />tributary areas. <br />- 3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.