My WebLink
|
Help
|
About
|
Sign Out
2283
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:34:46 AM
Creation date
7/30/2007 10:33:41 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/9/1983
DOCUMENT NO
2283
DOCUMENT NAME
TRACT 5117
NOTES
CROCKER HOMES
NOTES 2
SUBDIVISION OF 21.5 ACRE SITE INTO 52 PARCELS
NOTES 3
E. OF TERMINUS OF PARKSIDE DR., N. OF PLEASANTON SPORTS PARK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ 13. That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit. <br />14. That a separate water meter be provided to each <br />lot of record within the development unless <br />otherwise approved by the City Engineer. <br />15. That approval for the number, type and location <br />of fire hydrants be withheld pending final design <br />review by the Fire Marshal, and final review by <br />the City Engineer. <br />16. That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate, <br />connects to an approved point of discharge, and <br />meets both the immediate and long-range require- <br />ments of the sanitary sewer system in this and all <br />tributary areas. <br />17. That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />- otherwise approved by the City Engineer. <br />18. That approval of the storm drainage system be withheld <br />pending final design and until the developer has demonstrated <br />to the satisfaction of the City Engineer that the system is <br />adequate, connects to an approved point of discharge, meets <br />any and all applicable requirements of the Alameda County <br />Flood Control District - Zone 7, meets any and all applicable <br />requirements of the Federal Emergency Management Flood Hazard <br />Program, and meets the immediate and long-range requirements <br />of this development and all upstream areas intended to be <br />drained through this tract. <br />19. That electric power distribution, gas distribution, <br />communication service, and any required alarm systems <br />be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City <br />Engineer. <br />A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.