Laserfiche WebLink
14, That the developer comply with any and all appli- <br />cable requirements of the cross-connections <br />control and backflow prevention device programs <br />required by the California Administrative Code, <br />Title 17, <br />15, That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit. <br />16, That a separate water meter be provided to each <br />lot of record within the development unless <br />otherwise approved by the City Engineer, <br />17, That approval for the number, type and location <br />of fire hydrants be withheld pending final design <br />review by the Fire Marshal, and final review by <br />the City Engineer, <br />18, That the developer dedicate a PSE to the City for <br />water line extension purposes across the site to <br />effect the extension of the existing water line in <br />Mavis Drive to tie to Pico Avenue, The location and <br />width of this easement will be determined during <br />final design, <br />19, That the developer negotiate in good faith with the <br />Chamberlain Group to acquire for the City that parcel <br />of land on Vineyard Avenue adjacent to the west <br />property line of the development as described in that <br />plat and description prepared by MacKay and Somps. <br />This parcel is intended to be used for a City water <br />booster pump station to the benefit of this development <br />and others in the Vintage Hills area. <br />20, That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate, <br />connects to an approved point of discharge, and <br />meets both the immediate and long-range require- <br />ments of the sanitary sewer system in this and all <br />tributary areas, <br />A-3 <br />