My WebLink
|
Help
|
About
|
Sign Out
2194
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1982
>
2194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:34:29 AM
Creation date
7/26/2007 10:24:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/24/1982
DOCUMENT NO
2194
DOCUMENT NAME
TRACT 4890
NOTES
MORRISON HOMES
NOTES 2
SINGLE FAMILY RESIDENTIAL SUBDIVISION
NOTES 3
N SIDE OF VALLEY AVE, KOLIN ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
zq_ That the developer be responsible for the installa- <br />tion of the street lighting system within the <br />development. The street lights shall be 70 watt, <br />high pressure sodium vapor units mounted on gal- <br />vanized steel poles with poured in place bases, <br />on the LS-1C schedule per City requirements and <br />P.G.andE. standard details unless otherwise <br />specifically approved. Approval for the number, <br />location, and type of electroliers shall be <br />withheld pending final design and review by the <br />City Engineer. <br />25. That in-lieu park dedication fees be collected by <br />the City prior to approval of the final map at the <br />rate then in effect and for the total number of <br />lots in the final map, unless this requirement <br />has been otherwise satisfied. <br />26. That any existing assessment district, which the <br />property may be subject to, be cleared prior to <br />the approval of the final map or the developer <br />will cause a segregation to be completed in <br />conjunction with the final map. <br />Z~• That the developer submit a refundable cash bond <br />for hazard control prior to approval of the final map. <br />The amount of this bond will be determined by the <br />City Engineer. (Approximately $100 per lot - <br />$5000 minimum.) <br />28. That this development provide a safe and effective <br />circulation system for bicycles and pedestrians. <br />These facilities shall be designed and installed to <br />the satisfaction of the City Engineer and shall be <br />separated from vehicular traffic whenever possible. <br />29. That the developer submit detailed landscape and <br />irrigation plans as part of the improvement plans. <br />These plans should include a street tree planting <br />plan; landscape plans for medians, buffer strips, <br />and any right-of-way landscape areas; and an <br />irrigation plan with automatic controls. <br />30. An in-lieu cash payment shall be required for any <br />public improvements along the Valley Avenue frontage <br />which are deferred by the City Engineer. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.