My WebLink
|
Help
|
About
|
Sign Out
2005
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1981
>
2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:34:06 AM
Creation date
7/24/2007 10:35:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/20/1981
DOCUMENT NO
2005
DOCUMENT NAME
TRACT 4863
NOTES
RHEEM INVESTMENTS
NOTES 2
10 LOT INDUSTRIAL DUBDIVISION FOR AN APPR. 11.1 ACRE
NOTES 3
SANTA RITA RD. AND OAKLAND AVE., NE. OF RAILROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
lg, That the developer pay the applicable Zone 7 and City <br />connection fees and the meter cost prior to Council <br />approval of the development for any water meters (irri- <br />gation meters) not directly related to a building permit. <br />19. That a separate water meter be provided to each lot of <br />record within the development unless otherwise approved <br />by the City Engineer. <br />20. That approval for the number, type, and location of fire <br />hydrants be withheld pending final design, review by the <br />Fire Marshal, and final review by the City Engineer. <br />21. That approval of the sanitary sewer system be withheld <br />pending final design and until the developer has demon- <br />strated to the satisfaction of the City Engineer that the <br />proposed system is adequate, connects to an approved point <br />of discharge, and meets both the immediate and long range <br />requirements of the sanitary sewer system in this and all <br />tributary areas. The approved point of discharge shall be <br />the inlet manholes for the Amberwood siphon unless otherwise <br />approved by the City Engineer. <br />22. That a separate sanitary sewer lateral be provided to <br />each lot of record within the development unless otherwise <br />approved by the City Engineer. <br />23. That if a sanitary sewer lift station is installed for <br />use by the development and if it is reementdshallhbeCcom- <br />for maintenance and operation, an ag rior to the <br />pleted between the City and the developer p <br />approval of the final map to the effect that the developer <br />will provide a maintenance and operation fund for a minimum. <br />ten year period. <br />24. That approval of the storm drainage system be withheld <br />pending final design and until the developer has demon- <br />strated to the satisfaction of the City Engovedr oint of <br />the system is adequate, connectslioableapequirements of <br />discharge, meets any and all app <br />the Alameda Flood Control District, meets any and all <br />applicable requirements of the Federal Emergency <br />Management Flood Hazard Program, and meets the imme- <br />diate and long range requirements of this development <br />and all upstream areas intended to be drained through <br />this tract. An off-site storm drain system to the Arroyo <br />Mocho shall be required for this development unless <br />otherwise approved by the City Engineer. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.