My WebLink
|
Help
|
About
|
Sign Out
2082
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1981
>
2082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:34:08 AM
Creation date
7/24/2007 8:37:22 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/28/1981
DOCUMENT NO
2082
DOCUMENT NAME
PUD-81-28
NOTES
AXIOM GROUP
NOTES 2
DEVELOP PLAN APPROVAL FOR COMMERICAL/OFFICE DEVELOPMENT, REZONE PARKS FROM C-C TO PUD OR TO OTHERS
NOTES 3
FIRST STRRET, ANGELA ST. , MAIN STREET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Res..- 2083 <br />Page 6 <br />44. That electric power distribution, gas distribution, (~ <br />communication service, and any required alarm systems <br />be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City <br />Engineer. <br />45. That the developer contribute his proportionate share <br />of the cost of the traffic signal proposed to be installed <br />at the intersection of First Street, Pico Avenue and <br />Bernal Avenue. The amount of this contribution shall be <br />determined by the City after discussions with the <br />developer and paid by the developer prior to issuance <br />of any building permits. <br />46. That the developer contribute his proportionate share of <br />the cost of revising the existing signal installation <br />at the First Street and Ray Street intersection to provide <br />for left turn phases against the increased flow of <br />First Street traffic, The amount of this contribution <br />shall be determined by the City after discussion with <br />the developer and paid by the developer prior to the <br />issuance of any building permits. <br />47. That the developer shall apply for a lot line adjustment <br />or file a new parcel map to increase the width of <br />parcels 2 and 3 from 100 ft. to 125 ft. This shall be ~,, <br />accomplished prior to finalization of the lease between <br />the developer and the Southern Pacific Transportation <br />Company for the 25 ft. wide strip of land on the west <br />sides of those two parcels. <br />48. That the developer/owner dedicate those parcels of land <br />at the property line corners of First and Abbie and <br />First and West Angela needed to create curved returns. <br />The radii of these returns will be determined by the <br />City Engineer at the time of development. <br />49. That except for the compact-car spaces shown on the <br />development plan, all parking shall be provided in <br />accordance with the parking standards of the City of <br />Pleasanton as set forth in Article 16 of the zoning <br />code. <br />50. That the 10 year lease for the Delucchi & Wayside parks <br />shall be executed by the City and Southern Pacific <br />prior to final approval of case PUD-81-28. <br />51. That the conveyance of land from William Gale to <br />Southern Pacific for the 22' x 28' x 36' x 30.2' <br />parcel of land located west of Parcel No. 1 and the grant <br />of easements for the area of the 19 private parking spaces <br />shown at the western edge of parcel 1 shall be finalized r', <br />prior to development of the subject property. <br />
The URL can be used to link to this page
Your browser does not support the video tag.