Laserfiche WebLink
31, That a sanitary sewer sampling manhole be provided on the <br />sanitary sewer lateral unless otherwise waived by the City <br />Engineer. <br />32. That prior to issuance of a building permit, the developer <br />shall pay the applicable Zone 7 and City connection fees and <br />water meter cost o~ a*.y water meters (irrigation meters) not <br />directly related to a building permit. <br />33. That the developer dedicate to the City for street <br />right-of-way purposes those parcels of land intended <br />to be public streets. <br />34. That the developer grant an easement to the City over <br />those parcels shown as public service easements (P.s.E.) <br />and which are approved by the City Engineer or other parcels <br />which may be designated by the City Engineer. <br />35. That approval of the design for the line, grade, and <br />structural sections for the streets serving this develop- <br />ment be withheld pending final engineering design and <br />review by the City Engineer. <br />36, That vertical P.C.C. curbs and gutters be constructed <br />within this development unless o*_herwise approved by the <br />City Engineer and that the curb and gutter be poured mono- <br />lithically with the sidewalk when the sidewalk is adjacent. <br />3~, That all existing wells, septic tanks or holding <br />tanks on the site be properly sealed, filled and abandoned <br />prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or <br />special approval is obtained from the City Engineer for <br />temporary use of an existing well for construction water. <br />Any wells designated for abandonment or any wells encountered <br />during construction, are to be aallin~ea415)a443r9300e with a <br />permit obtained from Zone 7 by 5 <br />3g, That the haul route for allthetCitalEngineer priorttosthe <br />development be approved by Y <br />start of any construction. <br />