My WebLink
|
Help
|
About
|
Sign Out
2530
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1984
>
2530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:42 AM
Creation date
7/23/2007 9:59:13 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/26/1984
DOCUMENT NO
2530
DOCUMENT NAME
PUD-81-30-21D
NOTES
CALLAHAN-PENTZ PROPERTIES
NOTES 2
2 STORY BUILDING OFFICE COMPLEX DESIGN REVIEW
NOTES 3
WILLOW RD. 400 FT., INTER. OF WEST LAS POSITAS BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C <br />39. That the developer submit <br />plan or procedure as part <br />the final approval of the <br />40. That the developer submit <br />part of the improvement p <br />the development. <br />an erosion and sedimentation control <br />of the improvement plans prior to <br />development. <br />a dust control plan or procedure. as <br />Lans prior to the final approval of <br />41. That storm drainage swales, gutters, inlets, outfalls, and <br />channels not within the area of a dedicated public street <br />or public service easement approved by the City Engineer be <br />privately maintained by the property owners or through an <br />association approved by the City. <br />42. That approval of the water supply and distribution system be <br />withheld pending final design and until the developer has <br />demonstrated to the satisfaction of the City Engineer that <br />the proposed system meets both the immediate and long-range <br />requirements for supplying water in this area. <br />~: <br />93. That the developer comply with any and all applicable requirements <br />of the cross-connections control and backflow prevention device <br />programs required by: the California Administrative Code, <br />Title 17. <br />44. That approval for. the number, type and location of fire <br />hydrants be withheld pending final design, review by the <br />Fire Marshal, and final review by the City Engineer. <br />45. That approval of the sanitary sewer system be withheld pending <br />final design and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed system is <br />adequate, connects to an approved point of discharge, and meets <br />both the immediate and long-range requirements o£ the sanitary <br />system in this and all tributary areas. <br />46. That if a sanitary sewer lift station is installed for <br />use by the development and if it is accepted by the City <br />for maintenance and operation, an agreement shall be com- <br />pleted between the City and the developer prior to the <br />approval of the development to the effect that the developer <br />will provide a maintenance and operation fund for a minimum <br />ten year period. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.