Laserfiche WebLink
EXHIBIT A <br /> <br />SCOPE OF WORK <br /> <br />I. Prepare a topographic map for Foothill Road from Stoneridge <br /> Drive to Bernal Avenue. <br /> <br /> A.Update existing topographic map done in 1984. <br /> (No field work included) <br /> <br /> 1. Research: Obtain information on existing <br /> improvements from improvement plans <br /> o Engineer 16 hours @ $68.00 $ 1,088 <br /> o. Technician 40 hours @ $50.00 2,000 <br /> <br /> 2. Plotting: Plot information obtained above. <br /> o Engineer 8 hours @ $55.00 440 <br /> o Technician 80 hours @ $50.00 4,000 <br /> <br /> 3. Supplemental Topo: Convert 50 scale TMI <br /> topo to 40 scale. <br /> o Technician 4 hours @ $50.00 200 <br /> <br /> 4. Photo & Printing: Match 1984 topo and <br /> TMI topo, and obtain 24 by 36 sheets of <br /> Foothill Road <br /> o Engineer 8 hours @ $79.00 632 <br /> o Technician 16 hours @ $50.00 800 <br /> o Photo Work Lump Sum 1,500 <br /> o Printing Lump Sum 300 <br /> $10,960 <br /> <br /> B. Obtain new topographic map. (Computer plotted X <br /> sections available.) <br /> <br /> 1. Field Control: <br /> 48 hours @ $122.00 $ 5,856 <br /> <br /> 2. Office Support: <br /> 24 hours @ $68.00 1,632 <br /> <br /> 3. Fl~ & Plot: 40 scale topo at one foot <br /> contour intervals 15,000 <br /> <br /> 4. Miscellaneous: Photo for 24 x 36 sheets 600 <br /> Technician to set up for photo <br /> 24 hours @ $50.00 1,200 <br /> $24,288 <br /> <br />NOTE: Items B1 and B2 cost may be reduced if a satellite system <br /> is used to set up photo control. <br /> <br /> <br />