My WebLink
|
Help
|
About
|
Sign Out
2617
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1985
>
2617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:34 AM
Creation date
7/17/2007 10:20:33 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/27/1985
DOCUMENT NO
2617
DOCUMENT NAME
TRACT 5436
NOTES
PONDEROSA HOMES
NOTES 2
SUBDIVIDE 75 ARCE SITE INTO 253 PARCELS
NOTES 3
S. OF PLEASANTON CANAL, N. OF HANSEN DR. AND W. OF VELLEY AVE. AND CAMINO SEGURA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
20. That the developer submit a dust control plan or procedure as <br />part of the improvement plans prior to the final approval of the <br />development. <br />21. That storm drainage swales, gutters, inlets, outfalls, and <br />channels not within the area of a dedicated public street or <br />public service easement approved by the City Engineer be <br />privately maintained by the property owners or through an <br />associaton approved by the City. <br />22. That approval of the water supply and distribution system be <br />withheld pending final design and until the developer has <br />demonstrated to the satisfaction of the City Engineer that the <br />proposed system meets both the immediate and long-range <br />requirements for supplying water in this area. <br />23. That the developer comply with any and all applicable <br />requirements of the cross-connections control and backflow <br />prevention device programs required by the California <br />Administrative Code, Title 17. <br />24. That the developer pay the applicable Zone 7 and City connection <br />fees and the meter cost prior to Council approval of the <br />development for any water meters (irrigation meters) not directly <br />related to a building permit. <br />25. That approval for the number, type and location of fire hydrants <br />be withheld pending final design, review by the Fire Marshal, and <br />final review by the City Engineer. <br />26. That approval of the sanitary sewer system be withheld pending <br />final design and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed system is <br />adequate, connects to an approved point of discharge, and meets <br />both the immediate and long-range requirements of the sanitary <br />system in this and all tributary areas. <br />27. That approval of the storm drainage system be withheld pending <br />final design and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the system is adequate, <br />connects to an approved point of discharge, meets any and all <br />applicable requirements of the Alameda County Flood Control <br />District - Zone 7, meets any and all applicable requirements of <br />the Federal Emergency Management Flood Hazard Program, and meets <br />the immediate and long-range requirements of this development and <br />all upstream areas intended to be drained through this <br />development. <br />28. That electric power distribution, gas distribution, communication <br />service, and any required alarm systems be installed underground <br />in a joint utility trench unless otherwise specifically approved <br />by the City Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.