Laserfiche WebLink
37. The developer shall pay a connection fee to the City as <br />reimbursement for connecting to the existing sanitary sewer main <br />in the Western Pacific Railroad right-of-way. The amount of this <br />payment will be determined during final design by the City <br />Engineer. This connection fee shall be paid prior to City <br />approval of this development for construction. <br />38. A heritage tree report shall be submitted for this development <br />prior to final design. The proposed improvements shown on this <br />tentative map are subject to change during final design if deemed <br />necessary by the City Engineer in order to effect the measures <br />required to pressure specific heritage trees. <br />