My WebLink
|
Help
|
About
|
Sign Out
2757
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1986
>
2757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:29 AM
Creation date
7/16/2007 10:08:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/12/1986
DOCUMENT NO
2757
DOCUMENT NAME
PUD-85-8
NOTES
PRUDENTIAL INSURANCE COMPANY OF AMERICA
NOTES 3
AMEND LAND USE, CIRCULATION,A ND GROWTH FOR DEVELOPMENT AGREEMENT FOR BUSINESS PARK COMPLEX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a.7 Fact. The City has formed an Environmental <br />Monitoring Commission to monitor the air quality <br />within Pleasanton, and Condition 18 requires <br />development to cease if primary pollutant <br />concentrations violate standards. <br />a.8 Finding. The No Project Alternative, the Reduced <br />Intensity Alternative, and the Mixed Use <br />Alternative, which could partially mitigate the <br />significant effects on air quality, are infeasible. <br />a.9 Fact. See Section XII (infeasibility of <br />alternatives). <br />V. Noise. <br />A. Significant Effect. Increased noise levels along <br />roadways in residential areas of North Pleasanton which <br />could potentially exceed the City's maximum noise level <br />guidelines for sensitive residential receptors. <br />a.l Finding. Mitigation measures to achieve acceptable <br />residential noise level incorporated into the <br />Project will substantially lessen the effect. <br />a.2 Fact. Condition 19 requires Developer to implement <br />an acoustical monitoring program to monitor noise <br />levels at certain specific areas of the Project and <br />to implement a noise abatement program, including <br />installation of soundwalls and residential <br />installation, to ensure City standards are met. <br />a.3 Fact. Acoustical analysis at Muirwood Park to <br />determine mitigation measures to meet federal <br />guidelines will be done and noise mitigation <br />measures taken, if needed. <br />B. Significant Effect. Generation of truck noise. <br />b.l Finding. Mitigation measures incorporated into the <br />Project to reduce generation of truck noise will <br />substantially lessen this effect. <br />b.2 Fact. Condition 20 requires Developer to relocate <br />trucks to routes within the site. <br />C. Significant Effect. Noise levels along I-580 and I-680 <br />will exceed City and FHWA standards in some instances. <br />c.l Finding. Exterior mitigation measures to meet <br />local standards would conflict with the I-580 <br />Scenic Highway Plan. <br />c.2 Fact. The I-580 Scenic Highway Plan seeks <br />retention of vistas while allowing economically <br />- 17 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.