My WebLink
|
Help
|
About
|
Sign Out
2784
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1986
>
2784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:30 AM
Creation date
7/16/2007 8:59:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/23/1986
DOCUMENT NO
2784
DOCUMENT NAME
TRACT 5615
NOTES
JOHN AND ALISON PAYNE
NOTES 3
SUBDIVIDE 2.8 ACRE SITE INTO 36 PARCELS FOR RESIDENTAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. 2784 <br />April 23, 1986 <br />21. That approval of the water supply and distribution system be <br />withheld pending final design and until the developer has <br />demonstrated to the satisfaction of the City Engineer that <br />the proposed system meets both the immediate and long-range <br />requirements for supplying water in this area. <br />22. That the developer comply with any and all applicable <br />requirements of the cross-connections control and backflow <br />prevention device programs required by the California <br />Administrative Code, Title 17. <br />23. That the developer pay the applicable Zone 7 and City <br />connection fees and the meter cost prior to Council approval <br />of the development for any water meters (irrigation meters) <br />not directly related to a building permit. <br />24. That approval for the number, type and location of fire <br />hydrants be withheld pending final design, review by the <br />Fire Marshal, and final review by the City Engineer. <br />25. That approval of the sanitary sewer system be withheld <br />pending final design and until the developer has <br />demonstrated to the satisfaction of the City Engineer that <br />the proposed system is adequate, connects to an approved <br />point of discharge, and meets both the immediate and <br />long-range requirements of the sanitary system in this and <br />all tributary areas. <br />26. That if a sanitary sewer lift station is installed for use <br />by the development and if it is accepted by the City for <br />maintenance and operation, an agreement shall be completed <br />between the City and the developer prior to the approval of <br />the final map to the effect that the developer will provide <br />a maintenance and operation fund for a minimum ten year <br />period. <br />27. That approval of the storm drainage system be withheld <br />pending final design and until the developer has <br />demonstrated to the satisfaction of the City Engineer that <br />the system is adequate, connects to an approved point of <br />discharge, meets any and all applicable requirements of the <br />Alameda County Flood Control District - Zone 7, meets any <br />and all applicable requirements of the Federal Emergency <br />Management Flood Hazard Program, and meets the immediate and <br />long-range requirements of this development and all upstream <br />areas intended to be drained through this development. <br />28. That electric power distribution, gas distribution, <br />communication service, and any required alarm systems be <br />installed underground in a joint utility trench unless <br />otherwise specifically approved by the City Engineer. <br />29. That the developer be responsible for the installation of <br />the street lighting system serving the development. The <br />street lights shall be 70 watt, high pressure sodium vapor <br />units mounted on galvanized steel poles with poured in place <br />
The URL can be used to link to this page
Your browser does not support the video tag.