Laserfiche WebLink
Geotechnical Engineering Services Proposal PR89055 <br /> For Pavement Failure Evaluation June 28, 1989 <br /> Northbound_Section of Hopyard Road ENCLOSURE 1 <br /> City of Pleasanton <br /> <br /> COST ESTIMATE <br /> iTEMIZED BREAKDOWN <br /> <br />Field Exploration: <br /> <br /> Drill Rig & 2 Operators 16 Hours at $130/Hr. $ 2,080.00 <br /> Staff Engineer 20 Hours at $ 67/Hr. 1,340.00 <br /> Project Manager 4 Hours at $ 84/Hr. 336.00 <br /> Misc. Materials & Support Lump Sum 500.00 <br /> Traffic Control Lump Sum 1~500.00 <br /> <br /> Sub-Total, Field: $ 5,T~6.00 <br /> <br />Laboratory Testing: ' <br /> <br /> In-Situ Moisture/Density 20 Tests at $ 20/ea. $ 400.00 <br /> Direct Shear 2 Tests at $135/ea. 270.00 <br /> Unconfined Compression 3 Tests at $ 50/ea. 150.00 <br /> Consolidation 2 Tests at $260/ea. 520.00 <br /> Expansion Index 2 Tests at $150/ea. 300.00 <br /> R-Value Determination 2 Tests at $170/ea. 340.00 <br /> Moisture/Density Curve 2 Tests at $115/ea. 230.00 <br /> Plasticity Index 2 Tests at $ 95/ea. 190.00 <br /> Sieve Analysis 3 Tests at $ 80/ea. 240.00 <br /> <br /> Sub-Total, Lab: $ 2,640.00 <br /> <br />Site Reconnaissancet Literature <br />Review, Geotechnical Evaluation <br />and Report: <br /> <br /> Staff Engineer 90 Hours at $67/Hr. $ 6,030.00 <br /> Project Manager 40 Hours at $84/Hr. 3,360.00 <br /> Drafting 20 Hours at $39/Hr. 780.00 <br /> Clerical 10 Hours at $30/Hr. 300.00 <br /> <br /> Sub-Total, Engineering: $10,470.00 <br /> <br /> GRAND TOTAL: $18,866.00 <br /> <br /> ESTIMATED RANGE: $17,000.00 - $20,000.00 <br /> <br /> BSK <br /> <br /> <br />