My WebLink
|
Help
|
About
|
Sign Out
RES 89308
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 11:52:18 AM
Creation date
11/24/1999 12:40:02 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/18/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMP DRESSER & McKEEINC, <br /> Mr. Joseph Elliott <br /> July 12, 1989 <br /> Page 3 <br /> <br /> · Services after completion of the construction, such as inspections <br /> during any guarantee period and reporting observed discrepancies <br /> under guarantees. <br /> <br /> · Preparing to serve or serving as a consultant or witness for the <br /> City in an~ litigation, public hearing, or other legal or <br /> administrative proceeding. <br /> <br /> · Property surveys o= preparation of maps for acquisition of lard <br /> easements. <br /> <br /> . Construction staking· <br /> <br /> · Printing of plans and specifications. <br /> <br />S~RVICES BY TBECITY <br /> <br />CDr~'S attached scope of services is based upon the condition that the <br />following services will be provided by the City in connection with these <br />projects: <br /> <br /> · Labor and safety equtlmsnt to open and protect manholes to operate <br /> valves and hydcnts. <br /> <br /> · Daily, but not continuous, inspection services. <br /> <br />It iS estimated that ~e level of effort in performing Tasks 1 through <br />will be in the range of $35,000 to $45,000. <br /> <br />It is proposed that compensation tO ~ for engineering services as <br />outlined in Tasks I through 6, based upon normal hourly charge rates for <br />labor plus out-of-pocket expenses incurred specifically for this project <br />plus ten percent for handling as per the attached Billing Rate Schedule. <br /> <br />We will bagin shop drawing reviews the day following receipt oE <br />authorization and will continue our services in accordance with the <br />construction schedule. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.