My WebLink
|
Help
|
About
|
Sign Out
RES 89308
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 11:52:18 AM
Creation date
11/24/1999 12:40:02 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/18/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> <br /> CDM CAMP DRESSER & McKEE INC. <br /> Ofie Wllfiul Creek Conlet <br /> tnvitOnmlfRII lf~mlltl, 1¢~/11~, 1~ ~ngll A~, Suite ~ <br /> ~lnn~, I m~lp~f CO,Su~S ~lnut ~m, ~IH~fitl ~ <br /> 4~5 ~ FU NO. 415 ~-4114 <br /> <br /> July Z2, 1989 <br /> <br /> Mr. Joseph ~lliott <br /> Director of Public works and Utilities <br /> City of Pleasanton <br /> P.O. Box 520 <br /> Pleasanton, CA 94566-0802 <br /> <br /> Canyon Meadows Pun~ Station <br /> <br /> Dear Joet <br /> <br />In reply to the re<~est of AZ Baez and Steve Cusenza of your staff, w~-have <br />prepared this proposal to perform services during construction of the <br />Canyon Meadows Pump Station. <br /> <br />CDM proposes to perfore the [oilowing services.. <br /> <br />Task 1 - Shop Pra~_n~ Review <br /> <br />Review and approve (or take other appropriate action) shop drawings and <br />samples, the results of tests and inspections, and other data which the <br />Contractor is required to sul~dt, but only for conformance with the design <br />concept of the project and con~liace with the information given in the <br />Contract DoCuments (but Such review and approval or other action shall be <br />extended to means, methods, sequences, techniques, or procedures of <br />construction, or to safety precautions and procjrams incident thereto); <br />detemine the acceptability of substitute materials and eguilaent proposed <br />by the Contractor; and receive and review (for general content as required <br />by the Specifications) maintenance and operating instructions, schedules, <br />guarantees, and certificates of inspection which are to be assembled by <br />Contractor in accordance with the Contract Documents. <br /> <br />Task 2 - Assist. with Cha~.~ie Orders <br /> <br />Issue all instructions of the city to Contractor; issue necessary <br />interpretations and clarifications of the Contract Documents and in <br />cameorich therewith prepare change orders as required/act as initial <br />interpretor of the requirements of the Contract Documents pertaining to the <br />execution and progress of the work; but CIM shall not be liable for the <br />results of any such interpretations or decisions rendered by him in good <br />faith. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.