Laserfiche WebLink
BROWN AND CALDWELL~ <br /> CONSULTING ENGINEERS <br /> <br />June 15, 1989 <br /> <br />Mr. Joseph Elliott <br />Director of Public ~orks and Utilities <br />City of Pleasanton <br />200 Old Bernal Avenue 11-3826-01/1 <br />Pleasanton, California 94566 11-3826-01/6 <br /> <br />Subject: Proposal for Additional Construction <br /> Staking and Engineering Services During <br /> Construction Period As Part of Amendment <br /> No. 3, Contract for Consultant Services, <br /> Preliminary Design Phase of Cross-Town <br /> Sanitary Sewer Interceptor <br /> <br />Dear Mr. Elliott: <br /> <br />As directed by Garry Lee on June 14, 1989, we are proceeding with <br />the completion of the subject project with the following additions: <br /> <br /> 1. Provide additional construction staking within the next <br /> 12 months (up to 4 field days). <br /> <br /> 2. Provide additional construction staking at the following <br /> bore pits, as requested by MJB Pipeline: <br /> <br /> a. Hopyard Road and Del Valle Parkway <br /> b. Union Pacific Railroad Crossing <br /> 3. Review Contractor's submittals. <br /> <br /> 4. Review Contractor's proposals for changes as requested by <br /> the City staff. <br /> <br /> 5. Provide assistance during construction period beyond the <br /> maximum cost ceiling of $4,700. <br /> <br />The above additions and changes are outside the scope of services <br />to our Contract for Consulting Services, Preliminary Design Phase <br />of Cross-Town Sanitary Sewer Interceptor, dated February 2, 1988, <br />and subsequent amendments. We estimate that the costs for the <br />above changes in scope of services are as follows: <br /> <br /> ENGINEERING DEH'. <br /> <br />MAILING: POST OFFICE BOX 8045 WALNUT CREEK, CALIFORNIA 94596-1220 <br />STREE~ 3480 BUSKIRK AVENUE PLEASANT H ILL CALIFORNIA 94523-4342 · (415) 937-9010 · F~: (415) 937-9026 <br /> <br /> <br />