My WebLink
|
Help
|
About
|
Sign Out
PC 102506
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2000-2009
>
2006
>
PC 102506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2017 3:27:20 PM
Creation date
7/12/2007 10:06:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
10/25/2006
DOCUMENT NAME
PC 102506
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
considerable time and effort in meeting with the Pazk District personnel, Linda Chavez, <br />and with staff. <br />Ms. Decker presented the tall report and described the background, layout, and scope of <br />this project. <br />In response to an inquiry by Commissioner Olson regazding whether staff believed this <br />application would have been approved as an original application, Ms. Decker believed <br />that would have been the case. Commissioner Olson expressed surprise that this <br />application had returned to the Planning Commission for 2.5 feet. <br />THE PUBLIC HEARING WAS OPENED. <br />Mike Renquist, applicant, noted that the pedestrian path that would be impacted by the <br />height increase was over 1,000 feet away from the property across the lake. This was the <br />azea that would be visible to a hiker. He noted that the tiles were chosen to be consistent <br />with the Vineyard Avenue Corridor Specific Plan. <br />THE PUBLIC HEARING WAS CLOSED. <br />Commissioner Blank noted that he was surprised that the original PUD did not contain a <br />condition for automatic sprinklers. Ms. Decker confirmed that was correct. <br />Commissioner Blank moved to find that the proposed modification is covered by the <br />previously approved Final Environmental Impact Report for the Vineyard Corridor <br />Specific Plan and the previously approved PUD development plan findings for <br />PUD-Ol and to recommend approval to the City Council of Case PUD-Ol-09M, <br />subject to the conditions of approval as shown on Exhibit B of the staff report, as <br />recommended by staff, with the addition of a condition that an automatic fire <br />sprinkler system be installed in the residence as specified by the Fire Chief of the <br />Cities of Pleasanton and Livermore. <br />Commissioner O'Connor seconded the motion. <br />THE PUBLIC HEARING WAS RE-OPENED. <br />Mike Renquist, applicant, supported Commissioner Blank's proposed modification for <br />the installation of an automatic fire sprinkler system. <br />THE PUBLIC HEARING WAS CLOSED. <br />PLANNING COMMISSION MINUTES October 25, 2006 rage i~ of ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.