Laserfiche WebLink
Exhibit C <br />Applied Biosystems revised estimate of reimbursement for: <br />1. MBM Property <br />Permit Work <br />Devcon memo dated 11/2/04 <br />• O'Grady Paving letter to Devcon dated 10/22/02 plus OH&P= $16,634 <br />• Jos J. Albanese letter to Devcon dated 10/23/02 for <br />280 LF @ $14.50 =$4,060 plus OH&P= 4 139 <br />Total Permit Work $20,773 <br />Extra Work <br />Devcon Change Proposal Request number 76 dated 1/17/03 <br />(75% of $4,017) _ $3,014 <br />Devcon Change Proposal Request number 65 dated 1/17/03 <br />• O'Grady Paving Daily Extra Work Report 12309 <br />dated 11/16/02 (40% of $6,725) _ $2,690 plus OH&P = $2,743 <br />Devcon Change Proposal Request number 65 dated 1/17/03 <br />• O'Grady Paving Daily Extra Work Report 12301 dated 11/16/02 <br />(25 feet or 20% of $3,709) _ $742 plus OH&P = $757 <br />Devcon Change Proposal Request number 72 dated 1/3/03 <br />• O'Grady Paving Daily Extra Work Report 12285 <br />dated 11/12/02 (245 feet or 69% of $6,437) _ $4,442 <br />plus OH&P = $4,529 <br />Revisions to the MBM Fire/Water Lines <br />Devcon Change Proposal Request number 55 dated 12/12/02 = $11,858 <br />Relocate Saw Cutting <br />Devcon Change Proposal Request number 31 dated 10/21/02 <br />(245 feet or 31 % of $65,197) = 20 211 <br />Total Extra Work $43,112 <br />Total MBM Reimbursement <br />2. Berlogar Property <br />Permit Work <br />Devcon memo dated 11 /2/04 <br />• O'Grady Paving letter to Devcon dated 10/22/02 <br />21% of $55,838 plus OH&P = $11,955 <br />• Jos J. Albanese letter to Devcon dated 10/23/02 <br />91 LF @ $14.50 = $1,320 plus OH&P= 1 346 <br />Total Permit Work $13,301 <br />$63,885 <br />Extra Work <br />Devcon Change Proposal Request number 61 dated 1/17/03 <br />