Laserfiche WebLink
EXHIBIT "A" <br /> <br /> UNIT TOTAL <br /> DESCRIPTION' QUANTITY PRICE PRICE <br /> <br />F. ELECTRICAL <br /> 1. Electroller 1EA. 1500.00 $1500.00 <br /> 2. Trenching 125 L.F. 10.00 $1250.00 <br /> <br /> SUBTOTAL $2,750.00 <br /> <br />G. LAND$CAFING <br /> LUMP SUM $3600.00 <br /> <br /> SUBTOTAL $3,600.00 <br /> <br /> TOTAL $38,344.00 <br /> ENGINEERING & SURVEY STAKING 10% X $38,344.00 $ 3,834.40 <br /> <br /> CITY PLAN CHECK FEES 4% X $38,344.00 $ 1,533.76 <br /> <br /> GRAND TOTAL $43,712.16 <br /> <br /> <br />