Laserfiche WebLink
g michael goldsworthy <br />architect aia <br /> 78 mission drive, suite b , pleasan~on, california 94566 <br /> (41S) 462-0500 <br /> <br /> DAYCARE FACILITY <br /> <br /> PLEASANTON, CA <br /> March 29, 1989 <br /> <br /> Electrical $ 4.00/S.F. <br /> Floor 2.00/S.F. <br /> Plumbing 1,000.00/Fixture <br /> New Ceiling 1.25/S.F. <br /> Insulation .65/S.F. <br /> Folding Partition ~ 15,000.00, Total <br /> New Doors 1,600.00/Each (9) <br /> HVAC 3.00/S.F. <br /> Kitchen 10,000.00 <br /> Sheetrock, 9,700 Sq. Ft. <br /> Paint 9,700.00 + Doors <br /> Lumber, 2 x 4 (10') <br /> Labor - Demolition, Framing, Finish, <br /> Miscellaneous <br /> Playground W/Fence 2.00/S.F. <br /> 15% Mark-Up <br /> 2% Bond <br /> <br /> ESTIMATED COST: 17~0Q_~ <br /> <br /> GMG:ko <br /> <br /> <br />