Laserfiche WebLink
study is done, consideration shall be given for credit for <br />park and recreation facilities made available to the public <br />within this project. <br />16. In the event the City adopts a school mitigation impact fee, <br />the developer shall be responsible for paying the adopted <br />rate, but not to exceed $0.25 per sq. ft. of building space, <br />for any buildings for which building permits have been issued <br />within one year of the adoption of the fee and for all <br />buildings constructed thereafter until revocation of the fee. <br />17. That all other conditions of case PUD-80-2 and modification <br />thereof shall remain in full Porce and effect. <br />/// <br />