My WebLink
|
Help
|
About
|
Sign Out
RES 89413
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2012 12:59:48 PM
Creation date
11/23/1999 12:10:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/3/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Attorney's Fees. The prevailing party in any <br />action brought to enforce or construe the terms of this <br />Agreement may recover from the other party its reasonable <br />costs and attorney's fees expanded in connection with such <br />an action. <br /> <br /> 18. Scope of A~reement. This writing constitutes the <br />entire agreement between the parties relative to engineering <br />services for the project and modification hereof shall not <br />be effective unless and until such modification is evidenced <br />by a writing signed by both parties to this Agreement. <br /> <br /> 19. Limitation of Liability. To the maximum extent <br />permitted by law, CH2M HILL's liability for City of <br />Pleasanton's damages will not exceed the compensation re- <br />ceived by CH2M BILL under this Agreement. <br /> <br /> The City of Pleasanton recognizes that the Scope of <br />Work included herein is to provide construction management <br />services for a project designed by others. As such, the <br />City agrees that CH2M BILL is not liable for the designs and <br />actions of others. <br /> <br /> 20. Cost Estimate. Any cost estimates provided by <br />CH2M HILL will be on a basis of experience and Judgement, <br />but since it has no control over market conditions or <br />bidding procedures CH2M BILL cannot warrant that bids or <br />ultimate construction costs will not vary from these cost <br />estimates. <br /> <br /> 21. Limit Authority and Responsibility. The presence <br />of duties of CH2M HILL's personnel at a construction site, <br />whether as onsite representative or otherwise, do not make <br />CH2M BILL or its personnel in any way responsible for those <br />duties that belong to the construction contractors or other <br />entities, and do not relieve the construction contractors or <br />any other entity of their obligations, duties, and respon- <br />sibilities, including, but not limited to, all construction <br />methods, means, techniques, sequences, and procedures neces- <br />sary for coordinating and completing all portions of the <br />construction work in accordance with the Contract Documents <br />and any health or safety precautions required by such con- <br />st~uction work. CH2M BILL and its personnel have no <br />authority to exercise any control over any construction con- <br />tractor or other entity or their employees in connection <br />with their work or any health or safety precautions and have <br />no duty for inspecting, noting, observing, correcting, or <br />reporting on health or safety deficiencies of the construc- <br />tion contractor or other entity of any other persons at the <br />site except CH2M HILL's own personnel. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.