My WebLink
|
Help
|
About
|
Sign Out
RES 89412
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2012 12:59:31 PM
Creation date
11/23/1999 12:10:22 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/3/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AHENDHENT NO. 8 <br /> CITY OF PLEASANTON AND CH2M HILL <br /> AUTHORIZATION FOR EXTRA SERVICES <br /> DURING CONSTRUCTION <br /> FOR THE <br /> STONERIDGE DRIVE INTERCHANGE <br /> <br />1. PURPOSE <br /> <br /> The purpose of this AMENDMENT is to authorize the CON- <br /> SULTANT to perform extra work as described in Para- <br /> graph 2 of this AMENDMENT and to compensate the CONSUL- <br /> TANT for these extra services as shown in Paragraph 4 <br /> of this AMENDMENT, all in accordance with the pro- <br /> visions of Article 1 of the AGREEMENT between the par- <br /> ties hereto dated July 2, 1985. <br /> <br />2. SCOPE OF WORK <br /> The work authorized by this AMENDMENT includes: <br /> <br /> A. Review construction shop drawings and structural <br /> calculations for falsework for bridge construction <br /> as described in CALTRANS' Falsework Manual, <br /> current edition. <br /> <br /> B. Continue to provide additional construction <br /> staking services for the "Negotiated Contract" as <br /> described in Task 11-4 of AMENDMENT No. 7. <br /> <br /> C. Other miscellaneous Services During Construction <br /> shall be performed as directed by the CITY. <br /> <br />3. TIME OF PERFORMANCE <br /> <br /> The extra work described in Paragraph 2 of this AMEND- <br /> MENT shall be provided on an "on-call" basis; work <br /> started on May 1, 1989 and will continue throughout the <br /> duration of all construction activities for the Stone- <br /> ridge Drive Interchange which is expected to end in <br /> June 1990. <br /> <br />4. COMPENSATION AND PAYMENT <br /> <br /> Compensation for CONSULTANT's services authorized by <br /> this AMENDMENT shall be on a "Labor and Expense" basis <br /> as provided in Article 2 of this AGREEMENT. The cost <br /> ceiling for the work included in this AMENDMENT shall <br /> be $75,000; the amount shall be subject to change by <br /> separate amendment if the SCOPE OF SERVICES or TIME OF <br /> PERFORMANCE of this AMENDMENT requires adjustment. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.