Laserfiche WebLink
Timings <br />498: Vineyard & Ruby Hill 9/18/2006 <br />~ ~ ~' ~ ~' <br />Control Delay 18.9 4.9 6.2 5.8 17.8 6.5 <br />18.9 4.9 6.2 5.8 17.8 6.5 <br />9/18/2006 Synchro 6 Report <br />Dowling Associates, Inc. Page 4 <br />Total Split (s) 26.0 26.0 10.5 36.5 23.5 23.5 <br />Actuated q/C Ratio 0.53 0.53 0.60 0.64 0.25 0.25 <br />