Laserfiche WebLink
Timings <br />353: Bernal & Valley • * 9/18/2006 <br />Lane <br />Prot Perm Prot Prot <br />Permitted Phases 6 8 <br />Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 <br />Total Split (s) 23.5 42.6 42.6 12.2 31.3 15.0 43.4 43.4 11.8 40.2 63.7 <br />Yellow Time (s) 4.4 4.4 4.4 3.1 4.4 3.1 3.7 3.7 3.1 3.7 <br />Lead/Laa Lead Lead Lead Lao Lao Laa Lead Lead Laq Lead <br />Recall Mode None Max Max None C-Max None None None None None <br />Actuated g/C Ratio 0.19 0.36 0.36 0.08 0.26 0.11 0.14 0.14 0.31 0.34 0.52 <br />Control Delay 80.7 32.1 4.4 100.3 40.8 85.9 54.2 13.6 28.8 75.9 35.4 <br />Total Delay 80.7 32.1 4.4 100.3 40.8 85.9 54.2 13.6 28.8 75.9 35.4 <br />Ao~roach Delav 43.7 47.8 72.0 51.3 <br />Maximum v/c Ratio: 1.03 <br />9/18/2006 Synchro 6 Report <br />Dowling Associates, Inc. Page 1 <br />