Laserfiche WebLink
HCM Unsignalized Intersection Capacity Analysis <br />494: Vineyard & Project 9/11/2006 <br />__ <br />'~' ~ ~_' <br />Volume Left 0 21 4 <br />cSH 1700 865 349 <br />Analysis Period (min) 15 <br />9/11/2006 Synchro 6 Report <br />Dowling Associates, Inc. Page 1 <br />Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 <br />Pedestrians <br />Walking Speed (ft/s) <br />Approach LOS C <br />Average Delav 0.5 <br />