My WebLink
|
Help
|
About
|
Sign Out
RES 07127
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2007
>
RES 07127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2007 4:22:07 PM
Creation date
6/12/2007 4:21:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/15/2007
DOCUMENT NO
RES 07127
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Plant materials selected shall be appropriate to site specific <br />characteristics such as soil type, topography, climate, amount and <br />timing of sunlight, prevailing winds, rainfall, air movement, patterns of <br />land use, ecological consistency and plant interactions to ensure <br />successful establishment. <br />• Landscaping shall also comply with City of Pleasanton ordinances and <br />policies regarding water conservation. <br />The CC&Rs covering the future property subdivision shall include the <br />above statements in their wording. <br />e. Bulk construction materials stored outdoors that may contribute to the <br />pollution of storm water runoff shall be covered as deemed appropriate by <br />the City Engineer and/or the Chief Building Official as applicable. The <br />CC&Rs covering the future property subdivision shall include this <br />statement in their wording. <br />f. Prior to grading permit issuance the project developer shall submit a copy <br />of the State Water Resources Control Board Notice of Intent (NOI) for <br />coverage under the State Construction Storm Water General Permit for <br />projects with clearing, grading and excavation exceeding the current <br />standards. <br />g. All metal roofs shall be finished with rust-inhibitive paint. The CC&Rs <br />covering the future property subdivision shall include this statement in <br />their wording. <br />h. All roof drains shall be connected to the development's storm drain <br />system. The CC&Rs covering the future property subdivision shall include <br />this statement in their wording. <br />Urban Stormwater Construction Requirements: <br />91. The project developer shall submit a Stormwater Pollution Prevention Plan <br />(SWPPP) for review and approval by the City Engineer prior to issuance of <br />building or grading permits. Failure to comply with the approved construction <br />SWPPP may result in the issuance of correction notices, citations or stop work <br />order. The following construction Best Management Practices (BMPs), as well <br />as any other applicable measure, shall be included in the SWPPP and <br />implemented as approved by the City. <br />Page 18 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.