My WebLink
|
Help
|
About
|
Sign Out
RES 89342
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 12:23:01 PM
Creation date
11/22/1999 11:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/15/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'SCOPE OF SERVICES FOR LANDSCAPE IMPROVEMENTS <br />FOR STREET MEDIANS AT VARIOUS LOCATIONS <br />(CITY OF PLEASANTON, PROJECT #885070) Page 2. <br /> <br /> B. Prepare construction documents including: <br /> <br /> 1. Site construction layout and planting plans, <br /> details, notes and legend. <br /> <br /> 2. Site construction details. <br /> <br /> 3. Irrigation plans and details. <br /> <br /> 4. Specifications per City approved format. <br /> <br /> 5. General conditions and bidding requirements shall <br /> be provided by City of Pleasanton. <br /> <br /> C. Bid quantity takeoffs and final opinion of probable <br /> construction cost segregated for each project <br /> location. <br /> <br /> D. Review meetings and submittals at 60%, 95% and 100% <br /> completion. <br /> <br /> E. General project management and in-house coordination. <br />PHASE V: NON-SALARY COSTS <br /> <br />Non-salary costs shall include all project related reproduction, <br />photo mylars, submittals, 30 bid sets, City archival set, travel <br />(at .30/mile), deliveries and ten percent (10%) accounting and <br />handling charges. <br /> <br />PHASE VI: EXTRA SERVICES <br /> <br />A. All work performed by TerraMedia requested/approved by City <br /> of Pleasanton not specifically outlined in this proposal <br /> including, but not limited to: <br /> <br /> 1. Changes in project scope or requirements following <br /> approval of work submitted. <br /> <br /> 2. Special environmental impact investigations and related <br /> research. <br /> <br /> 3. Traffic study and report. <br /> <br /> 4. Field or laboratory testing required during the <br /> construction phase not specifically included in basic <br /> services. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.