Laserfiche WebLink
EXHIBIT "B" <br /> <br />FEE PROPOSAL FOR LANDSCAPE IMPROVEMENTS AT VARIOUS LOCATIONS <br />(CITY OF PLEASANTON PROJECT #885070) <br /> <br />The total proposed fee for Phases I through IV as outlined in the <br />preceding Scope of Services is Twelve Thousand Four Hundred Fifty <br />Dollars ($12,450.00) and will be billed monthly on an hourly <br />basis not to exceed the maximum amount for each phase as follows: <br /> <br />Scope of Services <br /> <br />I: Analysis and Evaluation $280.00 <br />II: Preliminary Design $2,750.00 <br />III: Design Development $2,190.00 <br />IV: Construction Documents $5,680.00 <br />V. Non-Salary Costs $1,550.00 <br /> <br />TOTAL PROPOSED FEE: $12,450.00 <br /> <br />Extra Services, as outlined in Phase VI will be billed monthly at <br />the following hourly rates: <br /> <br /> Principal $70.00 <br /> Project Manager $60.00 <br /> Landscape Architect $50.00 <br /> Draftsman $40.00 <br /> Clerical $35.00 <br /> <br />This fee proposal and rate schedule shall remain in effect for a <br />minimum of 120 calendar days commencing August 1, 1989. After <br />that period, if this fee proposal remains unsigned, the fee and <br />rate schedule quoted herein may be subject to change. <br /> <br />TetraMedia appreciates this opportunity to be of service to you. <br />If this proposal is satisfactory, please sign and date both <br />copies and return one for our files. <br /> <br />Sincerely, <br /> <br />Chad Crutcher, ASLA X <br />Principal Representing: <br />CLA #2035 <br /> <br /> Date: <br /> <br /> <br />