Laserfiche WebLink
LABORATORY TESTS <br /> <br />(Unit charge for laboratory testing including the normal Laboratory work and reporting of results <br />only. Unusual or time*consuming sample preparation or special tests are billed at hourly charge <br />for the laboratory technician. Charges for testing which are not listed will be given upon <br />request. Similarly, a reduction of the fee schedule rate can be given for a large number of <br />tests). <br /> <br /> Billing Billing <br /> Rate/Test Rate/Test <br />Classification Tests Strength Tests <br /> Alterberg Limits (Pl & LL) . . . $ 95 (including moisture content and <br /> Sieve Analysis ......... 7~ dry unit weight determinations) <br /> Percent Passing #200 Sieve . . . 36 Direct Shear, per point <br /> Hydrometer Analysis ...... 87 a. Undisturbed ........ <br /> Sand Equivalent ........ 77 b. Remotded .......... 70 <br /> Specific Gravity ........ 93 TriaxiaL Compression, per point <br /> Bulk Specific Gravity ...... 80 a. UnconsoLidated, undreined 95 <br /> Noisture Content/Unit Weight . . 10 b. UnconsoLidated, undrained <br /> Compaction Curves and backsaturated ..... 159 <br /> a. 4" mold ........ 145 c. Consolidated, undrained . . 170 <br /> b. 6" mold ........ 17Z d. Consolidated, undrained and <br /> c. Cat Impact (wet) . . 145 backsaturated ....... 217 <br /> d. Cat Impact (dry) . . . 172 e. Consolidated, drained . . . 170 <br /> e. 1 Point Verification.. 61 f. Pore pressure measurements. <br /> Durability Factor g. RemoLded specimens, add, <br /> a. Fine ......... 137 per point ......... <br /> b. Coarse ........ 110 Unconfined compression <br />R-Value Tests a. Undisturbed ........ 61 <br /> Not requiring reproportioning.. 19~ b. RemoLded .......... 97 <br /> Requiring reproportioning .... 216 Consolidation Tests <br /> Cement, time, other ....... 216 CincLuding moisture content and dry <br />Concrete Tests unit weight determinations) <br /> a. Compression tests, set a. Undisturbed ........ 145 <br /> of three specimens . . 45 b. Remotded .......... 181 <br /> b. Trial batch ...... 580 c. Time compression curve, <br />Shrink-Swell Tests per increment ....... <br />(including moisture content and dry <br />unit weight determinations) <br /> a. Undisturbed ...... 59 <br /> b. RemoLded ....... 114 <br /> <br /> SPECZAL CONDZTZONS <br /> <br />In the event that the CLient requests termination of the work prior to completion of a report, He <br />reserve the right to complete such analyses and records as are necessary to place our files in <br />order and, where conaidered by us necessary to protect our professional reputation, to complete a <br />report on the work performed to date. A termination charge to cover the cost thereof in an amount <br />not to exceed 30 percent of all charges incurred up to date of the stoppage of the Nork may, at <br />the discretion of BERLOGAR GEOTECNN]CAL CONSULTANTS, be made. <br /> <br />All work including Letters and reports prepared by BERLOGAR GEOTECHNICAL CONSULTANTS shall remain <br />the sole property of BERLOGAR GEOTECHNICAL CONSULTANTS until payment in full is received. <br /> <br /> L[NITATIONS <br /> <br /> BERLOGAR GEOTECNNICAL CONSULTANTS provides services in the field of <br /> Soil Engineering - Engineering Geology, in accordance with presently <br /> accepted professional practices. No warranty, either expressed or <br /> implied, is granted as part of performance of our work. <br /> <br />For any damage on account of any error, omission or other professional negligence, our Liability <br />wilt be Limited to a sum of $50,000 or our fee, whichever is greater. <br /> <br />Zn the event the Client makes a claim against BERLOGAR GEOTECHNICAL CONSULTANTS at Law or <br />otherwise, for any alleged error, omission or other acts arising out of the performance of our <br />professional services, and the CLient fails to prove such claim, then the Client shall pay all <br />costs incurred by BERLOGAR GEOTECHNICAL CONSULTANTS in defending itself against the claim. <br /> <br /> BILLING <br /> <br />Invoices wilt be issued every month, payable upon receipt, unless otherwise agreed, CLient agrees <br />to pay on receipt all invoices not questioned within 10 days after mailing by BERLOGAR <br />GEOTECHNICAL CONSULTANTS. Any questions raised after this lO-day period will be answered by <br />BERLOGAR GEOTECNNICAL CONSULTANTS and should any credit be due, BERLOGAR GEOTECHNICAL CONSULTANTS <br />~itl apply the credit to future invoices, or if requested by CLient, refund any amount due. <br /> <br />A service charge of 2 percent per month (but not exceeding the maxiu rate allowable by law) will <br />be payable on any amounts not paid within 30 days, payment thereafter to be applied first to <br />accrued interest and then to the principal unpaid amount, Any attorneyms fees or other costs <br />incurred in collecting any delinquent amount shall be paid by the CLient. <br /> <br /> <br />