Laserfiche WebLink
City of Pleasanton December 21, 1988 <br />· Quote No. 7097G Page 6-1 <br /> <br /> SECTION 6.0 <br /> <br /> PROJECT COSTS <br /> <br /> The estimated costs for the project tasks described in Section 2.0 through 5.0 <br /> are presented below. The actual costs will be billed on a time and material <br /> basis based on the Schedule of Rates and Charges provided under separate <br /> cover. Technical performance is contingent on Appendix A, Terms and <br /> Conditions. <br /> <br /> ESTIMATED COSTS TO BE BILLED ON A <br /> TIM!~ AND MATERIALS BASIS <br /> <br /> ZQgJLU D,Q 7,.dmj-e Cost <br /> <br /> Task 3.1 Site Inspection and Document Review $550.00 <br /> Task 3.2 Exploratory Drilling of Borings $10,102.00 <br /> Task 3.3 Monitoring Well Construction $3,520.00 <br /> Task 3.4 Monitoring Well Development $810.00 <br /> Task 3.5 Groundwater Sampling $715.00 <br /> Task 3.6 Surveying $1,1 00.00 <br /> Task 3.7 Laboratory Analysis $9,025.50 <br /> Task 4.0 Included in Task 3.2 and 3.7 <br /> Task 5.0 Site Investigation Report Preparation $4.950,00 <br /> <br /> TOTAL $30,772.50 <br /> <br /> The individual tasks will be billed as they are completed. EES payment terms <br /> are net 30 days, due and payable upon receipt of our invoice. Interest of 1.5 <br /> percent per month will be assessed on any overdue balance. <br /> <br /> <br />