Laserfiche WebLink
Pleasanton Gateway Environmental Checklist <br />Project Description <br />The amount and distribution of building, landscape, and hardscape areas for the proposed development <br />is described in the following table: <br /> Percentage <br />Land Use Land Area Of Site Area <br />Building area (including the Home Depot building and garden cen- 193,481 sq. ft. 27.9% <br />ter, Lon 's harmac ,and satellite retail/ ersonal service stores) <br />Pavin (includin on-site sidewalks, vacuum area, dr in area) 397,836 s . ft. 57.4% <br />Landscaping (including bio-retention areas, on-site landscaping, <br />and public right-of--way planting areas facing Stanley Boulevard, 101,974 sq. tt. 14.7 <br />Bernal Avenue, and Nevada Court) <br />Total 100% <br />Overall Proposal <br />A IIome Depot building materials store with 106,432 square feet of floor area and a 34,760 <br />square-foot garden center. Its loading/service area will be placed behind the building facing the <br />PG&E substation property. [ts main building height will vary from 24 feet at the lowest point of <br />the garden center to 29 feet at the top-edge of the building cornice. Store entrances and other ar- <br />chitectural features will vary in height from 31 feet to 43 feet for visual interest. The estimated <br />operating hours will be from 7:00 a.m. to 10:00 p.m. According to the applicants, this Home <br />Depot will be more retail oriented vs. the contractor orientation of the other Home Depots in the <br />Tri-Valley area. <br />A Longs Drugs store with 15,789 square feet of floor area. Its loading/service area will be <br />placed behind the building, facing the adjoining PG&E substation property, and potentially visi- <br />ble to Stanley Boulevard. Its building height will vary from 25-feet to 31-feet. The proposed <br />Longs will include adrive-through lane on its north side facing Stanley Boulevard. Except for <br />fast-food restaurants, staff believes that this will be the tirst drive-through retail use for Pleasan- <br />ton. <br />Three satellite stores buildings with 11,500 square feet (Stores "A"), 10,000 square feet (Stores <br />"B"), and 10,000 square feet (Stores "C") of floor area, respectively. Their building heights will <br />generally vary from 26- to 29-feet at the ridge to 41-feet at the cupolas. Neither tenants nor op- <br />erating hours have been identified for these buildings. "I'he applicants will modify the Stanley <br />Business Park PUD development plan to include the permitted and condition uses of the C-N <br />(Neighborhood Commercial) District. <br />One 5,000 square foot, drive-through restaurant. No restaurant operator has been identitied. <br />Site Plan <br />With the completed street widening, the landscape setbacks on Stanley Boulevard will vary from <br />22-feet at the project sign, to 32-feet by Longs, and to 40-feet by the Stores "A" building. The <br />landscape setbacks on Bernal Avenue will vary from 30-feet at the project sign to 35-feet at the <br />Stores "B" building. <br />Pleasanton Gateway Initial Study Page 5 of 37 November 8, 2006 <br />