My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Chief Building Official prior to the issuance of a building permit. The site <br />development plan shall include all required information to design and construct <br />site, grading, paving, drainage, and utilities. Specific items to be indicated on the <br />site development plan necessary to construct the improvements are to be in <br />accordance with the City of Pleasanton Private Development Design Guidelines <br />adopted April 15, 1986. <br />53. All retaining walls higher than four-feet from the top of the wall to the bottom of <br />the footway shall be constructed of reinforced concrete or shall be an approved <br />crib wall type. Calculations signed by a registered civil engineer shall <br />accompany the wall plans. <br />54. A sanitary sewer-sampling manhole shall be provided on each of the sanitary <br />sewer lateral from each building, unless otherwise waived by the Chief Building <br />Official. <br />55. The project developer shall submit two copies of the site soils report to the Chief <br />Building Official for third party peer review and shall pay for such review at the <br />time specified by the Director, but in all cases before the issuance of a grading <br />permit. <br />56. The soils engineer shall certify any building pad compactions of all lots containing <br />fill to the satisfaction of the Chief Building Official prior to the issuance of building <br />permits. <br />Construction Requirements: <br />57. All construction, including site improvements, building construction, and tenant <br />improvement construction shall be limited to the hours of 7:00 a.m. to 6:00 p.m., <br />Monday through Saturday. Signs stating construction hours shall be posted <br />throughout the construction site, in construction trailer(s), and on all floors of all <br />buildings during the duration of construction. The Planning Director may allow <br />earlier "start-times" for specific building construction activities, e.g., concrete- <br />foundation/floor-pouring, if it can be demonstrated to the satisfaction of the <br />Planning Director that the construction and construction traffic noise can be <br />mitigated. All construction equipment must meet Department of Motor Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. <br />58. At no time shall campers, trailers, motor homes, or any other vehicle be used as <br />living or sleeping quarters on the construction site. All such vehicles shall be <br />removed from the site at the end of each workday. A construction trailer shall be <br />allowed to be placed on the project site for daily administration/coordination <br />purposes during the construction period. <br />59. Final inspection by the Planning Department is required prior to occupancy. <br />Page 12 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.