My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2007 3:47:12 PM
Creation date
5/11/2007 11:17:13 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />THE CITY OF <br />'- <br /># "' "' -'- "" CITY COUNCIL AGENDA REPORT <br />j'L£~S~4NTON® <br />May 15, 2007 <br />Planning and Community Development <br />TITLE: PCUP-165/PDR-529/PUD-81-25-7M, REGENCY CENTERS (DON <br />MACKENZIE AND PETE KNOEDLER)/HOME DEPOT -CONSIDER AN <br />APPLICATION FOR A PUD MAJOR MODIFICATION, CONDITIONAL <br />USE PERMIT, AND DESIGN REVIEW APPROVAL TO ALLOW THE <br />CONSTRUCTION OF 193,481 SQUARE FEET OF COMMERCIAL <br />AREA, INCLUDING A HOME DEPOT BUILDING SUPPLY STORE AND <br />GARDEN CENTER, A LONGS DRUGS PHARMACY WITH <br />DRIVE-THROUGH, AND MISCELLANEOUS NEIGHBORHOOD RETAIL <br />STORES INCLUDING ONE DRIVE-THROUGH, ON AN <br />APPROXIMATELY 16-ACRE PARCEL LOCATED AT 3450 STANLEY <br />BOULEVARD, AT THE VALLEY AVENUE/BERNAL AVENUE/ <br />STANLEY BOULEVARD INTERSECTION, IN THE STANLEY <br />BUSINESS PARK <br />PROPERTY OWNERS: Frank Auf der Maur and Konrad Rickenbach <br />GENERAL PLAN: Retail/Highway/Service Commercial, Business and Professional <br />Offices <br />ZONING: PUD-C (Planned Unit Development -Commercial) District <br />SUMMARY <br />The proposed project is a commercial center which includes a Home Depot, Longs <br />Drugs, and a variety of businesses oriented towards the nearby residential <br />neighborhoods. The development is designed with an integrated architectural theme <br />reflecting the site's location at a gateway intersection/entrance to the City. It includes <br />measures pertaining to its uses and operations to ensure its compatibility with the area, <br />and it includes traffic mitigation measures to ensure its safety and conformance to the <br />Pleasanton General Plan. Staff understands that there remains community concern <br />and opposition to the proposal based on size and location, traffic impacts, traffic noise, <br />and congestion on Valley Avenue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.