Laserfiche WebLink
PART B <br />AN ESTIMATE OF THE COST OF THE MAINTENANCE <br />2007-2008 <br />LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br />NO. 1993-2, BONDE RANCH <br />CITY OF PLEASANTON <br />A. Intensely Landscaped Areas (maintenance): <br />1. Independence Drive (107,400 sq. ft.) <br />2. Livingston Way (20,500 sq. ft.) <br />total area 127,900 sq. ft ................................................... $11,116.56 <br />B. Water .................................................................................................... $3,105.00 <br />C. Power <br />1. Five Irrigation Controllers ............................................... $245.00 <br />D. Fuel Transition Zone (Firebreak) 287,000 sq. ft. <br />1. Weed Abatement ........................................................... $4,183.44 <br />2. Fence Repair ................................................................. $3,200.00 <br />E. Street Lights <br />1. Re-lamping ....................................................................... $440.00 <br />F. Reserve/Long-Term Replacement Fund for scheduled loner term <br />replacement of various district improvements (see note)............ $ 2,459.73 <br />G. City of Pleasanton Administration ..................................................... $ 1,300.00 <br />SUBTOTAL <br />$26,049.73 <br />County Fees for Collection of Assessments .................................... $ 439.62 <br />GRAND TOTAL ......................................................................... $26,489.35 <br />Assessment per Unit (102 units) @ $257.22 per year <br />1 unit cr $252.91 (City parcel) <br />Note: <br />An existing surplus of approximately $47,000.00 exists for Lighting and Landscape <br />Maintenance District 1993-2, Bonde Ranch. These funds arc held in an interest bearing <br />account until needed for repairs to the landscaping, irrigation systems, fencing or other <br />District features. <br />4 <br />