Laserfiche WebLink
implementing the following measures during all construction phases of the <br />project: <br />a. Gather all construction debris on a regular basis and place it in a <br />dumpster or other container which is emptied or removed on a weekly <br />basis. When appropriate, use tarps on the ground to collect fallen <br />debris or splatters that could contribute to storm water runoff pollution. <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br />street pavement and storm drains adjoining the site. Limit construction <br />access routes onto the site and place gravel on them. Do not drive <br />vehicles and equipment off paved or graveled areas during wet <br />weather. Broom-sweep the street pavement adjoining the project site <br />on a daily basis. Scrape caked-on mud and dirt from these areas <br />before sweeping. <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br />drain inlet nearest the downstream side of the project site in order to <br />retain any debris or dirt flowing in the storm drain system. Maintain <br />and/or replace filter materials to ensure effectiveness and to prevent <br />street flooding. <br />d. Create a contained and covered area on the site for the storage of <br />bags, cement, paints, oils, fertilizers, pesticides, or other materials <br />used on the site that have the potential of being discharged into the <br />storm drain system through being windblown or in the event of a <br />material spill. <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers <br />into a street, gutter, or storm drain. <br />f. Ensure that concrete/gunite supply trucks or concrete/plaster <br />operations do not discharge wash water into street, gutters, or storm <br />drains. <br />61. The applicant shall apply for a temporary conditional use permit to allow the <br />existing modular building to remain on the site for the on-going preschool <br />program. The temporary use permit shall expire when the construction of the <br />education building is completed and the certificate of occupancy is issued. At <br />that that, the modular buildings shall be removed immediately. <br />62. The new parking lot shall not be connected to Golden Road. <br />63. The new parking lot shall not be connected to the existing parking lot on <br />Golden Road. <br />