My WebLink
|
Help
|
About
|
Sign Out
ORD 1949
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:46 PM
Creation date
4/20/2007 1:07:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
3/20/2007
DOCUMENT NO
ORD 1949
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Engineering <br />53. The project developer shall: <br />a. Submit a refundable cash bond for hazard and erosion control prior to <br />issuance of an Engineering or Building and Safety Division permit if <br />required. The City Engineer will determine the amount of this bond. <br />b. Submit a waste management plan to the Building and Safety Division prior <br />to issuance of building or demolition permits. The plan shall include the <br />estimated composition and quantities of waste to be generated and how <br />the project developer intends to recycle at least 50-percent of the total job <br />site construction and demolition waste measured by weight or volume. <br />Proof of compliance shall be provided to the Chief Building Official prior to <br />the issuance of a final building permit. During demolition and construction, <br />the project developer shall mark all trash disposal bins "trash materials <br />only" and all recycling bins "recycling materials only". The project <br />developer shall con-tact Pleasanton Garbage Service for the disposal of <br />all waste from the site. <br />c. Prior to building permit issuance, submit a grading and drainage design <br />plan to the Engineering Department for review and approval. The plan <br />shall demonstrate that the proposed development would minimize or <br />eliminate increases in the volume or rate of runoff associated with both <br />small and large storm event (including two-year to 100-year storm events) <br />from the development site. <br />d. Submit a construction Best Management Practices (BMPs) program for <br />review and approval by the Planning Director prior to issuance of building <br />and/or grading permits. The general contractor and all subcontractors and <br />suppliers of materials and equipment shall implement these BMPs. <br />Construction site cleanup and control of construction debris shall also be <br />addressed. Failure to comply with the approved construction BMP may <br />result in the issuance of correction notices, citations, or a stop work order. <br />54. Prior final occupancy, the subject property shall be connected to the public <br />sanitary sewer line and water service located in Pietronave Lane. All existing <br />septic tanks or holding tanks shall be removed or sealed, filled, and abandoned, <br />pursuant to the requirements of the Alameda County Department of Health <br />Services. <br />55. All utilities required to serve the existing house on-site shall be installed <br />underground, including telephone, cable, electric, and gas lines. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.