Laserfiche WebLink
8. Parking space no. 7 shall be designated as a compact space. Said modification <br />shall be shown on the plans submitted for issuance of building permits and shall <br />be subject to review and approval by the Planning Director prior to issuance of <br />building permits for the project. <br />9. The applicants shall revise the grading and drainage plan to drain some of the <br />parking lot areas to a bioswale, as determined by the City Engineer. Said <br />modification shall be submitted in conjunction with the plans submitted for <br />issuance of building permits and shall be subject to review and approval by the <br />City Engineer and Planning Director prior to issuance of building permits for the <br />project. <br />10. The windows shall be recessed approximately three inches from the outside face <br />of wall. Window specifications and typical installation details shall be included <br />with the plans submitted for issuance of building permits and shall be subject to <br />the review and approval by the Planning Director prior to issuance of building <br />permits for the project. <br />11. Except as otherwise approved by the Planning Director, the exterior stucco finish <br />on the building shall match the existing stucco finish on the Hopyard Village <br />Shopping Center buildings. The stucco finish shall be noted on the building <br />permit plans. <br />12. The proposed light green eave and rafter tail color ("Peaceful Thyme") shall be <br />substituted with the same brown accent color used on the Hopyard Village <br />Shopping Center buildings or shall be changed to a subdued/less intense color <br />subject to final review and approval by the Planning Director prior to painting. <br />13. The approved building colors and materials shall be indicated on the final <br />building permit plans. Any proposed revisions to these approved colors or <br />materials must be submitted for review and approval by the Planning Director <br />prior to painting/installation. <br />14. The property owner shall modify existing and/or create new cross access <br />easements and reciprocal parking agreements to allow shared parking and <br />access between the proposed commercial building and the Hopyard Village <br />Shopping Center. Said easements and agreements shall be recorded prior to <br />occupancy. The easements and agreements shall be subject to review and <br />approval by the City Attorney prior to recordation. <br />15. The project developer shall use their best efforts in implementing the measures <br />identified in the Green Building Council's (GBC), "Leadership in Energy and <br />Environmental Design (LEED)" in the design, construction, and operation of the <br />proposed building. These measures shall be shown on the building permit plan <br />set submitted for review and approval before issuance of a building permit. In <br />conjunction with the building permit application, the project developer shall <br />2 <br />