Laserfiche WebLink
materials only". The project developer shall contact Pleasanton Garbage Service <br />for all waste disposal. Only that portion of trash and recycling waste refused by <br />Pleasanton Garbage Service shall be disposed of or diverted by another <br />trash/recycling company. <br />46. The height of the building shall be surveyed and verified as being in conformance <br />to the approved building height as shown on Exhibit "A" or as otherwise <br />conditioned. Said verification is the project developer's responsibility, shall be <br />performed by a licensed land surveyor or civil engineer, and shall be completed <br />and provided to the Planning Department before the first framing or structural <br />inspection by the Building and Safety Division. <br />47. The applicants shall submit a pad elevation certification prepared by a licensed <br />land surveyor or registered civil engineer to the Chief Building Official and <br />Planning Director, certifying that the pad elevations and building location <br />(setbacks) are pursuant to the approved plans, prior to receiving a foundation <br />inspection for the structure. <br />48. Final inspection by the Planning Department is required prior to occupancy. <br />49. If archeological materials are uncovered during grading, trenching, or other on- <br />site excavation, all work on site shall be stopped and the City immediately <br />notified. The county coroner and the Native American Heritage Commission <br />shall also be notified and procedures followed as required in Appendix K of the <br />California Environmental Quality Act. A similar note shall appear on the <br />improvement plans. <br />50. Portable toilets used during construction shall be emptied on a regular basis as <br />necessary to prevent odor. <br />51. All backflow prevention devices, above ground irrigation controls, and above <br />ground irrigation meters shall be located and screened so as to minimize visual <br />impacts. The location of all backflow prevention devices, above ground irrigation <br />controls, and above ground irrigation meters and the quantity and type of <br />proposed landscape screening shall be subject to the review and approval of the <br />Planning Director prior to installation. <br />52. All parking spaces shall be striped. Wheel stops shall be provided unless the <br />spaces are fronted by concrete curbs, in which case sufficient areas shall be <br />provided beyond the ends of all parking spaces to accommodate the overhang of <br />automobiles. <br />53. Prior to issuance of a building permit, the developer shall pay the required <br />commercial development school impact fee as prescribed by state law and as <br />adopted by the Pleasanton Unified School District. <br />8 <br />