My WebLink
|
Help
|
About
|
Sign Out
PC 01/11/89
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
1980-1989
>
1989
>
PC 01/11/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2017 10:46:20 AM
Creation date
4/13/2007 4:38:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
1/11/1989
DOCUMENT NAME
PC 01/11/89
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROLL CALL VDTE <br />-------------- <br />c=AYES: Cccmmi ssi orce:~ s ~serger , !-lov ngh , He ;~t , .a: ~ci Chap. rman <br />}"!i chel otti <br />IVCcES: t~iane <br />F~DSEt•€T : I`lone <br />A~S~Tc=~It~t: Commissioner I'~atsern <br />F'esol ut i on S~?a. ~'C-B~-~ was entered and adapted approv. ng Case <br />~~`-U~v--: as mot 3 s7ned . <br />Z_85=5421_City_of_Pleasanton <br />Application of the City of Pleasanton for design review approval <br />for the development of a multiple-building operations service <br />center to be located on the north side of Husch Road adjacent to <br />its eastern terminus. Zoning far the property is "P" tPublic <br />and Institutional) District. <br />t{'!r. Swift preser:ted the staff report reccrmmendirsg appr-ct•raI ccf <br />Case Z-BS-~~~. He showed the Commission a rendering of the site <br />pure and noted that modificatians were made since the case <br />appeared in December. <br />The public hearing was opened. <br />Joe El?iotti Director of Public l=1ar~:s, represented the <br />application. :!e e::plair:ed brief?y that the reason for- the use <br />of pre-engi veered buildings i s tt-ce 1 ower cost Irhi ci-e saved t!':e <br />City between ~bf °D-7~~t~, R}+~t~. He said an ei gtat foot suunc#wal 1 r~i 1 ? <br />surround the facility e;t cept or: $t:sch Road and tf cat the area <br />will be erchanced with landscaping. <br />Di I l Eastman, ~'ol i ce Chief , tha~rght there might be a l act- of <br />awareness as to what Find of uses the building rai l l have. He <br />noted that t[-:i s i s a training station for R©l i ce arad firemen. <br />He explained the function of the pistol range and addressed the <br />issue of possibly offensive noise of the guns. It aaas <br />determined that the noise would not be excessive and that the <br />sound~r~al l ssoul d mitigate mast cf that . <br />Chairman t~Eichelotti as~~ed Chief Eastman how many hours of use he <br />erevi si oc-:ed for the we~cpons range. Chief Eastman estimated about <br />2a to :~U hours a month and no later than 1~1pm or before Sam. <br />Coaimi ssi aver Ha•,+t as~~ed i f there are any plans for apeni ng the <br />pistol range to the public. Chief Eastman said there are ro <br />plans. <br />Wes Jost and Joe Elliott showed a rendering of the rifle range. <br />C L]sTltTci ssi over Berger thactght <br />the add3ticn Uf landscaping. <br />the project was much ircproved with <br />The public hearing was closed. <br />`age 3 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.