My WebLink
|
Help
|
About
|
Sign Out
PC 02/24/88
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
1980-1989
>
1988
>
PC 02/24/88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2013 3:11:43 PM
Creation date
4/13/2007 2:05:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
2/24/1988
DOCUMENT NAME
PC022488
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commissioner f''[i chel ott i as~:ed C'tr . Swift about the <br />reconfiguration regarding the landscaping bel-find the guest <br />pari~i ng . Mr _ Swift responded t: gat there woui d would a 1 ar:dscape <br />isiar•.d. <br />Commissioner Tarver e::pressed concern that the moratorium is not <br />addre=_sinr~ the proble~-r, on ~}ine~;~ard A:~enue and until the roadwa~rs <br />are finished no major construction should be done on Vineyard <br />Avenue. :-ie ;referred no construction until the opening of the <br />Der--nal I oop <br />Chairma~j Lindse}• felt corrsfortable with the analysis that traf#ic <br />would be alleviated once the DernallValley loop i5 opened and <br />found it difficult to delay a project for nearly a year for <br />growth managemerot approval. <br />Commissioner Noyt stated he h_=,d no problem with the applicant <br />receiving groF,vth r~ianagement approval as long as Constructions <br />doesn't begin until bonding is in place. <br />A motson was made by Commissioner Derger, seconded by Chairman <br />Lindsey recor:~mending approval of Case F'UD-S?-1'-ihlr'S:-i~-1~4 <br />subject. to the conditions of the staff report. <br />ROLL CALL VOTE <br />AYES: Commissioners Der ger , 1-io~~t , ~i chel otti , and <br />Chairman Lindsey <br />~dt~ES: Commissioner Tarver <br />ADSEP~IT: !'done <br />A~SSTAIi~: 1'+ione <br />Resolution tUo. F'C-88-1~ alas entered and adopted r-ecammending <br />approval of Case F'UG-ti7-f ~-ih'?f 87-1-1i''i as motioned. <br />PUD_81_t7=~42D1_Castillo_Co_(State_FaEm_Insuran~e) <br />Application of Castillo Company tState Farm Insurance) for <br />design review approval to construct an approximately 34,91 sq. <br />ft. office structure on an approximately 1.84 acre site tSite <br />51C} located on Owens Drive, just west of the Chabot Canal. <br />Zoning for the property is FUD tPlanned Unit Development} - <br />Industrial, Commercial and Offices District. <br />~'lr . Sall f t presented the staff report recommending approval of <br />Case F'UD-81-=~r?-4?Le subject to the conditions of the staff <br />report. <br />The public hearing was opened. <br />Tom Dohlen of Castillo Co. represented t~'ie appaiCation. i-ie <br />stated that he has :,~or3:ed diligently with staff, State Farm, and <br />the l-Eacienda business F'a:-"=: ~issn. ; he Lead reviewed the sta-Ff <br />conditions and concurred with all of triem. He presented several <br />coior-ed renderings of the project and described the project arsd <br />the l andsCap i n sg - <br />F'age ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.