My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
041707
>
REGULAR MEETING
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 12:16:48 PM
Creation date
4/12/2007 12:16:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/17/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uu;u9 zuur u9 Or Frx 9258469645 BERLOGAR GEOTECHNIC ~ 003/004 <br />April 9, 2007 <br />lob No. 1806.306 <br />Page 2 <br />EARTHWORI{ OBSERVATIONS AND TESTING ESTIMATED COST <br />Mix Design Review <br />2 (rD, $750/review = $1,500 $1,500 <br />Project Supervision <br />l2 hours , $143.82/hr = $1,726 $1,726 <br />Word Processing <br />3 hours , $65.28/hr = $196 $196 <br />Final Report <br />1 $1,000/ea = $1,000 $1,000 <br />Estimated Subtotal $18,435 <br />Estimated Total 530,721 <br />We will provide the services tabulated above on a time and expense basis in accordance with the <br />attached "Fee Schedule - 2007." The above cost estimate is based on an 8-hour day and 5-day <br />week (Monday through Friday); overtime will result in extra costs. In addition, we have <br />minimum 3 hours show-up time if the work is not ready for our observation testing. We will <br />keep you advised of job charges by issuing monthly progress billing and will inform you of any <br />changed conditions which might significantly affect our total fee. <br />If you have any questions regarding our scope of services and fees, please call. If this cost <br />estimate is acceptable, please provide City of Pleasanton contract as the formal authorization of <br />our work- We are pleased to have the opportunity to be of service to you on this project. <br />Respectfully submitted, <br />BERLOGAR GEOTECHNICAL CONSULTAN S <br />/ _ <br />~e i .~ 7 ~~~~ ~ I <br />Woode Ste he s P u Sai-Win <br />Field Supervisor V ce President <br />G 2326 <br />WCS/PSl,:jmb <br />Attachment: <br />Fee Schedule - 2007 <br />IBU6.3U5/ZU2UI,doc <br />BERLOGAR GEGTECHNICAL CONSULTANTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.