My WebLink
|
Help
|
About
|
Sign Out
ORD 1947
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:46 PM
Creation date
3/29/2007 1:30:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
3/20/2007
DOCUMENT NO
ORD 1947
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the Standard Urban Stormwater Runoff Requirements for <br />compliance with Alameda County NPDES Permit #CA500229831 the project <br />shall also comply with the Permit's Hydro Modification requirements of the <br />Regional Water Quality Control Board for Alameda County. <br />92. Stormwater Construction Requirements <br />The project development shall submit a Stormwater Pollution Prevention Plan <br />(SWPPP) for review and approval by the City Engineer prior to issuance of <br />building or grading permits. Failure to comply with the approved construction <br />SWPPP may result in the issuance of correction notices, citations or stop work <br />order. The following construction Best Management Practices (BMPs), as well <br />as any other applicable measure, shall be included in the SWPPP and <br />implemented as approved by the City. <br />The project developer is responsible for implementing the following measures <br />during all construction phases of the project: <br />a. The project developer shall include erosion control/storm water quality <br />measures on the final grading plan which shall specifically address measures <br />to prevent soil, dirt, and debris from entering the storm drain system. Such <br />measures may include, but are not limited to, hydroseeding, hay bales, <br />sandbags, and siltation fences and are subject to the review and approval of <br />the City Engineer/Director of Building Inspection. If no grading plan is <br />required, necessary erosion control/storm water quality measures shall be <br />shown on the site plan submitted for an on site permit, subject to the review <br />and approval of the Director of Building Inspection. The project developer is <br />responsible for ensuring that the contractor is aware of and implements such <br />measures. <br />b. All cut and fill slopes shall be revegetated and stabilized after completion of <br />grading, but in no case later than October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. No <br />grading shall occur between October 15 and April 15 unless approved erosion <br />control/storm water quality measures are in place, subject to the approval of <br />City Engineer/Director of Building Inspection. Such measures shall be <br />maintained until such time as permanent landscaping is place. <br />c. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br />d. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />zi <br />
The URL can be used to link to this page
Your browser does not support the video tag.