Laserfiche WebLink
5. Prior to issumue of a building permit, the project dc~elupcr shall pad the applicable Zunc <br />7 and Cit}~ connection lees and water meter cost fur any water teeters, including irrigation <br />meters. additionally, the: pre~ject developer shall pay zany applicable Dublin San Ranum <br />Services District 1 DSRSD) sewer permit fee. <br />`). The project developer aclulo~~icd~~es that the Cite ~~f Pleasanton does not guarantee the <br />availability of sufficient sc~~~er capacit}~ to serve this development by the approval of this <br />case. ~uu1 that the project deg eloper agrees and acknu~~ledges that building permit <br />approval may be withheld if sewer capacity is {nand by' the City not to be a~~ailablc. <br />10. phis approval does nut guarantee the availability ufsuflicicnt ~~alcr to serve the project. <br />The Cite shall ~~.ithhold building permits fur the project if at the time building permits are <br />applied for, ^landatorv water rationing is in effect, unless the City has adopted a water <br />ol7set program and unless the project develi~pcr is participating in the progrmn. <br />Notwithstanding the project de~tlopcr's participation in such a program, the City may <br />~~ithhold building permits if the City determines that sult7cient water is nut a~~ziilable at <br />the time of application of building permits. <br />11. Prior to issuance of a buildin~~ permit, the applicant shzrll submit a [.EI:D checklist and <br />use their best efturts to implement the measures identilicd in the [~.5. Urcen Building <br />Councils i(1SGBC>, ..Leadership in Energy l:nvironmerrial Design (LE[iD~~~)" ~.0 rating <br />system in the design, construction, and operation of the proposed building. including all <br />future tenant improvements. <br />1?. Che project developer shall ettectivcly screen hroul vie~e all ducts, meters, air <br />condilionin~~ equipment, and any other mechanical equipment. ~~~hrther on the structure. <br />on the ground, ur on the roof, with materials architecturally compatible with the mai^ <br />structure. Screening details shall be shown on the plans submitted fur issuance of <br />building permits. the adequacy of which shall be determined by the Planning Director. <br />V1 required screening shall be prop-ided prior to occupancy. <br />1 ~. All mechanical equipment shall be constructed in such a nwnner that noise emanating <br />li~om it will not be perceptible beyond the property plane of the subject property. <br />ld. The location of any pad muuuted U-ausformers ur other utility cduipment' bogies shall be <br />subject to approval b}~ the Planning Director prior to issuance of permits by the Building <br />and tiatct}• Division. Such transformers shall be screened by landscaping or contained <br />~~ithin an enclosure matching the building and ~r~ith corrugated metal gates. :UI <br />transfonnurs shall be shown on the pl~u~s submitted for issuzuue of building permits. ~l~hc <br />project developer shall attempt to locate transformers at the rear of the site. <br />1 ~. The Iinal building materials and colors arc subject to the revic~~ and approval by the <br />Planning Director prior to the issuance of building permits..1ny changes to the approved <br />building materials and!or colors shall be submitted to the satisfaction ofthe Planning <br />Director. <br /> <br />