My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:11:40 PM
Creation date
3/15/2007 12:51:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pimlico Drive Tunuurt and Pipeline Project Enviroimientnl Checklist <br />IV. ENVIRONMENTAL CHECKLIST <br />The following checklist contains the environmental checklist form presented in Appendix G of <br />the CEQA Guidelines. The checklist form is used to describe the impacts of the Proposed <br />Project. A discussion follows each environmental issue identified in the checklist. Included in <br />each discussion are project specific mitigations which have been incorporated into the project <br />design as a part of the Proposed Project. <br />For this project, the following designations are used: <br />Potentially Significant Impact: An impact that could be significant and for which no <br />mitigation has been identified. If any potentially significant impacts are identified, an EIR must <br />be prepared. <br />Less than Significant With Mitigation Incorporated: An impact that requires mitigation to <br />reduce the impact to aless-than-significant level. <br />Less than Significant: Any impact that would not be considered significant under CEQA <br />relative to existing standards. <br />No Impact: Any impact that does not apply to the project. <br />1. AESTHETICS <br />Environmental Setting <br />The proposed project facilities are located within the City of Pleasanton on flat terrain. The <br />proposed water transmission pipeline will be located within Pimlico and Brockton drives. <br />Portions of these roadways are bounded by residential and commercial development. The site of <br />the fluoridation building, Zone 7 turnout and City of Pleasanton vault are situated in close <br />proximity to each other inmrediately south and adjacent to the Interstate Highway 580 sound <br />wall and on the north side of Pimlico Drive. Views onto the site from the east- and west-bound <br />lanes of Pimlico Drive and the residential area south and southwest of Pimlico Drive currently <br />consists of the sound wall next to Interstate Highway 580 and landscaping within the public <br />right-of--way. The landscaping consists of ornamental shrubs (~Icucia lor7giflolia and <br />Pittosporzun cr•assifolia~m) and small Austrian Willow trees (Geijeru pun~iflora) between the <br />sound wall and Pimlico Drive. One ornamental Australian Willow tree (Geijera pun~iflor•a) and <br />seven ornamental flannel bush shntbs (Fremorttoclendron California glory) occur at the <br />fluoridation building site. <br />The Santa Rita control valve vault will be located in a lawn area between the pedestrian sidewalk <br />next to Santa Rita Road and the parking lot of Rose Pavillion. Views of the site from the south <br />and west along Santa Rita Road are screened by several large trees planted between the road and <br />pedestrian sidewalk. The site of the control valve vault slopes upward towards the parking lot. <br />Views from the west of the control valve vault site from a one story commercial building <br />housing and deli next to the Rose Pavillion parking lot are slightly screened by a gently sloping <br />berm. <br />City of Nlcasanton 15 Winzlcr & Kelly <br />Draft Initial Study/Proposed iJcgahve Declaration August 2006 <br />04263501 <br />
The URL can be used to link to this page
Your browser does not support the video tag.