My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:11:40 PM
Creation date
3/15/2007 12:51:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />The Pimlico Drive Turnout project provides for an additional water service point from the <br />Zone 7 Water Agency water transmission pipeline. The new water service point will tap <br />into the existing Zone 7 water transmission line in Pimlico Drive and deliver water to the <br />existing Tassajara Reservoir. The facility will improve system hydraulics and allow for <br />better utilization of the Tassajara Reservoir's storage capacity. The project consists of <br />the construction of appurtenant valves, flow meters, water piping, telemetry, vaults and <br />a masonry building. The turnout will be located midblock of Pimlico Drive and adjacent <br />to the I-580 freeway and includes approximately 2,700 feet of 20-inch water pipeline in <br />Pimlico and Brockton Drives and a 10' x 16' masonry building (see map below). The <br />initial project was approved as part of the 2001-2002 CIP Program. <br /> <br /> <br />o \~ 1 ~~. <br />'~ <br />' ... <br />Pirr <br />m ~ ~ <br /> <br />~ <br />o <br />~~ <br />~ <br />~~ <br />~. ~ <br />;. <br />, ; <br />~ <br />d <br />t ^,;J <br />, <br />4 <br /> <br /> ~' , <br />~~ i / l <br /> J~' / % ~ <br /> <br /> <br />co -r. <br />~~ <br />b ooX Ct. <br />O~ <br />-- , <br />_~ `~ <br />~'~~~ ~_ <br />_ J Q <br />~ ~, <br />..~ <br />'~ <br />omtmwtE ca I ~ <br />a <br />Project Alignment. <br />Environmental Assessment <br />Environmental review for the project is covered by an Initial Study/Negative Declaration, <br />which is attached. The design is nearing completion and the corresponding plans, Initial <br />Study and Negative Declaration are complete and have been forwarded to the State <br />Clearinghouse, advertised of its availability for review and comment, posted on the <br />City's web site, and made available for review and comment in conformance with CEQA <br />guidelines. Notices of the City Council's public hearing on this item were sent to the <br />residents located in the project area. A complete list of corresponding comments and <br />responses received are listed below: <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.