My WebLink
|
Help
|
About
|
Sign Out
19 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
19 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:06:45 PM
Creation date
3/15/2007 12:31:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
19 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
improvements shall be subject to review and approval by the City Engineer and <br />Planning Director prior to issuance of a building permit. <br />72. The applicants shall submit a refundable cash bond for construction hazard prior to <br />issuance of an Engineering or Building Department permit. The amount of this <br />bond will be determined by the City Engineer. <br />73. The applicant's contractor(s) shall obtain an encroachment permit from the City <br />Engineer prior to moving any construction equipment onto the site or City right - <br />of -way. <br />74. The haul route for all materials to and from this development shall be approved by <br />the City Engineer prior to the issuance of an encroachment permit. <br />75. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of <br />a dedicated public street or public service easement approved by the City Engineer <br />shall be privately maintained by the property owner. <br />76. The design of the water supply and sanitary sewer systems shall be subject to the <br />review and approval of the City Engineer. <br />77. Approval of the storm drainage system shall be subject to the review and approval <br />of the City Engineer and Zone 7, as applicable, that the system is adequate, <br />connects to an approved point of discharge, meets any and all applicable <br />requirements of the Alameda County Flood Control District - Zone 7, meets any <br />and all applicable requirements of the Federal Emergency Management Flood <br />Hazard Program, the California Department of Fish and Game, and meets the <br />immediate and long -range requirements of this development and all upstream <br />areas intended to be drained through this development. <br />78. All utilities required to serve the proposed development shall be installed <br />underground, unless otherwise determined by the City Engineer. <br />79. The applicants shall submit a final utility plan showing the proposed sewer <br />system, water supply, electric power distribution, gas distribution, communication <br />service, Cable television, and any required alarm system for the site. Said plan <br />shall be subject to the review and approval of the City Engineer and the Planning <br />Director prior to the issuance of any building permits. <br />80. Any damage to existing street or sidewalk improvements during construction on <br />the subject property shall be repaired to the satisfaction of the Planning Director <br />and City Engineer at full expense to the developer. This shall include slurry seal, <br />overlay, or street reconstruction if deemed warranted by the City Engineer. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.