My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c O <br />g. INSULATION Possible Points <br />1. Install Insulffilon with 75% Recycled Content _. . _ _ ... _. <br />^ a. Walls andlor Floors <br />^ b. Ceilings _ , <br />2. Install Insulation that is Low•Emitting (Certified Section 01350) <br />^ a. Walls andtor Floors <br />^ b. Ceilings , <br />^ 3. Pre•Drywall Inspection Shows Ouallty Installation of Insulation _ ,. <br />I. HEATING, VENTILATION ~ AIR CONDITIONING Possible Points <br />^ 1. Design and Install HVAC System to ACCA Manual J. D, and S Recommendations <br />2. Install Sealed Combustion (Direct Vent) Units in Conditioned Space <br />^~ a. Furnaces ' <br />^ b Nlater Heaters <br />Q 3. No Fireplace or Sealed Gas Fireplace with Efficiency Rating Not Less Than 60°° <br />^ 4. Install ENERGY STAR Ceiling Fans with CFLs in Living Areas and Bedrooms <br />5. Install Ventilation System for Nighttime Cooling . <br />' 0 a. Whole House Fan <br />^ b. Automatically Gontrolfed Integrated System <br />^ c. Integrated System with Uariable Speed Control _ <br />6. Install Air Conditioning with Non-HCFC Refrigerants <br />7 Design and Install Effective Ductwork <br />^ a Install HVAC Und and Ductwork within Conditioned Space <br />^ b. Use Duct Mastic on All Dud Joints and Seams <br />^ c. Install Ductwork under Attic Insulation (Buried Duds) <br />^ d. Pressure Balance the Ductwork System for Master Bedroom <br />^~ e Protect Ducts during Construction and Clean All Ducts before Occupancy <br />^ S. Install Hlgh Efficiency HVAC FINer (MERV 6+) <br />^ 9. Install Zoned, Hydronlc Radiant Heating with Slab Edge Insulation <br />10. Install Mechanical Ventilation System <br />^ a. Any Wtwle House Ventilation System That Meets ASHRAE 62.2 <br />b. Install ENERGY STAR Bathroom Fan <br />^ c. All Bathroom Fans Are on Timer or Humidistat .. <br />^ 11. Use Low•Sone Range Hood Vented to the Outside <br />[] 12. Install Carbon Monoxide Alerm(s) <br />J. BtiJII.DING PERFORMANCE Possible Points <br />10°-a 1. Design and Build Hlgh PeAormance Homes (2 points for each 1% above T-24, up to 30 pts) <br />Enter the percent above TiOe 24 in the cell at lest. Any value over 16% wtll automaticalty eam 30 points. <br />2. House Obtains ENERGY STAR with Indoor AIr Package Certification <br />3. Inspeetion and Diagnostic Evaluations <br />^ a. Third Party Energy and Green Building Review of Home Plans <br />^ b. Blower Door Test Performed <br />^ c. House Passes Combustion Safety Backdraft Test <br />H. RENEWABLE ENERGY Possible Points <br />^ 1. Pre-Plumb for Solar Hot Water Heating <br />^ 2. Install Solar Water Heating System <br />^ 3. Install Wlring Conduit far Future Photovoltaic Installation 8 Provide 200 ft' of South-Facing Roof <br />4. Install Photovoltaic (PV) Panels <br />^ a. t.2 kW System <br />^ b. 2.4 kW System <br />^ c. 3.6 kW or more _ <br />New Home Green Points 2005 Edition Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.